Haworth Tompkins, in collaboration with Architecture 00 and LDA, are working with the Royal Docks Team (a joint initiative between the Mayor of London and the Mayor of Newham) on the Royal Victoria West study. The commission, won through an Architecture Design and Urbanism Panel 2 (ADUP2) competitive process, is to formulate a masterplan strategy and placemaking vision for this area of the Royal Docks. This includes feasibility work on underutilised sites in the Enterprise Zone and the opportunity to capitalise on the relocation of City Hall to the Royal Docks later in 2021.
Image courtesy of the Royal Docks Team
Haworth Tompkins has three projects shortlisted at this year’s Pineapple Awards: The Developer and Festival of Place, which celebrate excellence in placemaking. The shortlists demonstrate the strength of our approach to placemaking and collaborative design.
Unanimous planning permission has been granted for Troubadour Greenwich Peninsula, a new 3,000-capacity performance venue designed by Haworth Tompkins.
Haworth Tompkins Associate Director Ken Okonkwo has been reappointed as a Mayor’s Design Advocate (MDA) for the 2025–2028 term, marking his second appointment to the role.
2025 was a demanding year for the built environment, but also one of real momentum for Haworth Tompkins. Against a challenging economic and political backdrop, the practice continued to adapt, collaborate and deliver work of lasting value.
The £2 billion York Central regeneration project has submitted the latest planning application for the next stage of delivery and includes Haworth Tompkins designs for Foundry Village; a walkable, street-based neighbourhood designed that will deliver 368 mixed-tenure homes.
Theatr Clwyd has been shortlisted for Theatre Building of the Year at this year’s Stage Awards.
Pembroke Mill Lane, Cambridge and The Warburg Renaissance have been selected as Regional Finalists in the 2026 Civic Trust Awards and will now be considered for National Awards with the winners announced January 2026.
Haworth Tompkins has completed Backstage at the Old Vic, a new build six storey extension to the Grade II* listed Old Vic Theatre, in London’s Waterloo marking a bold new chapter in the theatre’s remarkable 200-year story.
| 30.10.25 | Construction Reaches Topping Off Milestone for the New Home of the American Repertory Theater at Harvard University → |
| 28.07.25 | Haworth Tompkins reveals plans for the redevelopment of Grade I listed De La Warr Pavilion → |
| 13.05.25 | Haworth Tompkins to lead design of affordable housing in £2.5 Billion York Central Regeneration → |